PHARMACEUTICAL PLANT, DURHAM, NC.
Location: Durham, NC
Services: Mechanical and Plumbing
Category: Pharmaceutical
Area :11,500 sq. Ft
Software: Autocad, HAP5.11, Bluebeam
3S MEP Provided MEP design service for the pharmaceutical manufacturing facility located in North Carolina State. The total project area is 18,500 sq. ft. The team designed the ISO class-8 cleanroom for a water bath, INH infill room, and QC lab.
Challenges during Project:
To design a space that maintains a low Relative Humidity level of 35 % at high ACH of 30, as per Class 8 cleanroom requirement. To design a ducting layout that can be fit in the existing structure joist and beam which include a VAV box and HEPA filter.