SOUTHEAST FINANCIAL CENTRE, MIAMI, FL.

SOUTHEAST FINANCIAL CENTRE, MIAMI, FL.

Location: Miami, Florida 
Services: Mechanical, Electrical, and Plumbing. 
Category: Office 
Area :23,000 sq. Ft
Software:Revit, HAP5.11, Bluebeam

3S MEP + S provided MEP & FP design service for the 23,000sq. ft office in Miami City, Florida. The mechanical design includes heat load calculation in hap 5.1, secondary ductwork for an existing system, ventilation design as per IMC-15. Plumbing design includes sanitary system, domestic water distribution system and sizing of the water heater. The electric design includes the lighting, power, and fire alarm layout, lighting fixture selection, automatic circuiting, and design control circuit. A challenge during this project was MEP coordination that could follow the existing building space limitation.