DAYCARE CENTRE, GREENBAY, WI.

DAYCARE CENTRE, GREENBAY, WI.

Location: Green Bay, WI
Services: Mechanical, Electrical, and Plumbing
Category: Education Facilities
Area : 14,500 sq. Ft
Software: Revit 2023, HAP 5.1, Bluebeam, Navisworks

The Daycare Center project in Green Bay, Wisconsin involved the provision of mechanical, electrical, and plumbing (MEP) design services by 3S MEP. The project required careful consideration of the needs of the facility. A significant challenge during the project was MEP coordination and clash detection with other disciplines.

3S MEP was responsible for the mechanical design aspects of the Daycare Center project. This included conducting a comprehensive heat load calculation to determine the heating and cooling requirements of the facility. Based on the calculations, the team designed the ventilation system to ensure adequate air exchange and indoor air quality. We also designed the HVAC ductwork layout to efficiently distribute conditioned air throughout the building. Additionally, 3S MEP assisted in the selection of appropriate Rooftop Units (RTUs) to meet the project’s specifications and requirements.

The plumbing design was a crucial aspect of the Daycare Center project. 3S MEP designed the domestic water and sanitary waste systems, ensuring proper supply and drainage throughout the facility. The team carefully selected appropriate plumbing equipment and fixtures to meet the hot water demands of the center. Furthermore, 3S MEP developed a gas piping diagram to facilitate the safe distribution of gas within the building.

Electrical design services included lighting and power layout that considered both functionality and energy efficiency. The team conducted load calculations to determine the electrical demand and designed the electrical system accordingly. Developed a Single Line Diagram (SLD) to illustrate the electrical connections and distribution within the facility.