SOUTHEAST FINANCIAL CENTRE, MIAMI, FL
3S MEP deals with space limitations for large office in existing building
Location: Miami, Florida
Services: Mechanical, electrical, and plumbing
Category: Office
Area: 23,000 sq. ft.
Software: Bluebeam, HAP 5.11, Revit
For the project in this 23,000 square foot office in Miami, 3S MEP + Structural had to work around space limitations in an existing building.
Mechanical designers calculated the heat load using HAP 5.11 in order to plan secondary ductwork for the existing system and provide ventilation to meet IMC-15 requirements.
The plumbing team designed sanitary and water distribution systems and sized the water heater.
Electrical work included designs for lighting, power, and fire alarm systems, selecting lighting fixtures, and designing automatic and control circuitry.
With all 3S MEP projects, a primary focus is integrating MEP and structural designs with the construction and architectural partners and the end-users to minimize the need for design adjustments or revisions during the construction process. Design teams from 3S MEP actively engage with all stakeholders to identify potential conflicts and optimize overall system layout. Our teams are exceptionally proficient at harmonizing essential building elements for successful outcomes.