RAJA FOODS WAREHOUSE, SCHILLER PARK, IL
3S designs MEP for large Raja Foods warehouse in Schiller Park
Location: Schiller Park, Illinois
Services: Mechanical, electrical, and plumbing
Category: Industrial/warehouse
Area: 175,600 sq. ft.
Software: Bluebeam, COMcheck, HAP 5.11, McQuay Duct Sizer, Revit
The Raja Foods warehouse in Schiller Park has packing, repacking, freezer, warehouse, and office areas. The facility requires advanced cooling and freezer systems that maintain specified temperatures that ensure the quality and safety of its food products.
Mechanical, electrical, and plumbing designs for this warehouse were provided by 3S MEP + Structural.
Mechanical teams from calculated individual heat loads to plan mechanical systems that would efficiently regulate temperatures in the various areas.
We designed a specialized ventilation system for the forklift battery charging area. Given that lead-acid batteries produce hydrogen gas at the 80-percent recharge point, strict design measures were taken to maintain gas concentrations below the 1-percent threshold.
To enhance overall efficiency, the team chose and integrated into the system equipment such as RTUs, exhaust fans with lead controllers, range hoods, and unit heaters.
The plumbing division designed the water supply and sanitary waste disposal systems. The system we engineered takes into account the individual needs in office spaces and other areas. The team also developed an efficient sanitary waste disposal system that complies with city code and applicable national standards.
Electrical services designed lighting and power layouts that are functional and energy efficient. The lighting was tailored to the specific requirements of each area to ensure well-lit, safe working conditions throughout the facility.
The team calculated electrical loads to determine demand and then designed the electrical system to meet the needs. A comprehensive fire alarm system was integrated into the system to enhance overall safety and comply with regulatory standards.
With all 3S MEP projects, a primary focus is integrating MEP and structural designs with the construction and architectural partners and the end-users to minimize the need for design adjustments or revisions during the construction process. Design teams from 3S MEP actively engage with all stakeholders to identify potential conflicts and optimize overall system layout. Our teams are exceptionally proficient at harmonizing essential building elements for successful outcomes.